Home ›Floor Frame Complete
Monday, 27 December 2004
The floor frame and two of the vertical bulkhead frames are now complete, but the floor sandwich and radiator frame has yet to be completed.
Welding on the floor frame is completed.
|
The mid-cabin and rear mid-cabin bulkhead frames mounted on the floor frame give the rover a third dimension.
|