Friday, 7 May 2004
It's taken a long time to get further with the project, since both of the main workers have been tied up with other duties (read: paid work). However, at last the steelwork plans were completed and the floor frame and vertical bulkheads are being assembled. Now that this work is in hand, the task for we MSA volunteers is to get busy with the support equipment for the powerplant: exhaust system, coolant plumbing, electrical and transmission.